The CKG SUNENERGY LTD project is located in Skarinos, with a total capacity of 1MWp. The photovoltaic (PV) park has been connected to the Medium Voltage (MV) network of the Cyprus Electricity Authority (ECA).
Suntechnics Ltd as the leader in photovoltaic systems, undertook the Design, Supply, Operation and Maintenance of the photovoltaic park.
Used 2466 JA Solar’s bifacial mono PERC PV panels with 405Wp power, 15 HUAWEI SUN2000-60KTL-M0 inverters and Metaloumin trackers on one axis for optimal performance!
The PV park will save approximately 1076 tons of CO2 emissions per year, an amount that 33634 trees would need to absorb.